5.5.3.03410_20181029
PC support 1.54
Added a refresh button in the advanced search.
Stay in the approval mode (time vs. expenses) when changing pages
Correction of a wording in the expenses (Quantity / Unit vs. Monetary / Unit)
Added at the WBS level to take into account the restriction parameter to the assignment (and estimate).
Added a tooltip for line warnings
Added a parameter for opening the description with double-click only.
Added a parameter to tell the number of years that can be found in the consultation
Added parameter for displaying Sifia information on activities (level 1, cost item)
Uniformity of tooltips on buttons in the application
Importing expenses.
Improved performance in time, expense, approval for Microsoft Edge.
The addition of activities is now dependent on PC 1.54.
5.5.3.12013_20190123
7026Added support for specific ratesJOV00380
7048Add filter to see only items awaiting approval for project approval
7069Adding cumulative maximum management to the hour bank
5.5.3.14216_20190214
7217Adding the client name to the line, if required (parameters)
7232Improved parameter management
7310Security caching by line.
5.5.3.15717_20190301
7321Update totals and actuals with an asynchronous job. (it will not block backups anymore)
3971Various improvements to automatic save to prevent it from crashingJOV-02008-R9Q6
3928Fix the display of intervals. When the screen was small, the list of hours went under the heading.JOV-02141-H8G4
3927Various memory leak issuesJOV-02070-K3D1
5.5.3.16305_20190307
3933In the alerts, you have to get the language from Tedi.5 instead of tedi.SL
5.5.3.19905_20190412
4022Fix at recent and favorites level to use the loaded WBS to validate the visibility of recent and favorites.JOV-02411-K4H7
5.5.3.19909_20190412
4032Put a loading indicator when sending the timesheetCAS-31469-W9B8
5.5.3.20605_20190419
4179Add a setting to identify resources that can use the AC Vacation BankJOV-02199-H2K2
5.5.3.21113_20190424
4058Adding productive / non-productive totalsJOV-01997-M8W0
5.5.3.21715_20190430
4206Added an option to hide the import button
5.5.3.21905_20190502
4209Setting that changes the accent color on the mobile site
5.5.3.24414_20190527
4253
4198Add an alert message to prevent the ETC from being exceeded
4197Add the ETC revision column to the left portion of the project approval.
5.5.3.24415_20190527
4284Using the PC function for assigned activities

Bug fixes 🔧

5.5.3.03410_20181029
Validation of the 24h overrun for the consultant applies to the used user Logged when one is "as" instead of the user "as"
When an adminstrator goes to see a timesheet "as" the wbs must refresh according to the user "as".JOV01236
If Canadian pay is installed, go to the company-level vacation bar instead of the
Fix of shortcuts. The arrows will iterate in the days. However in references, the alt + arrow must be pressed in order to fall back into the days. To allow specific editing of the reference.
Ability to display some additional information to the activities.
Add a parameter to tell how many years you can go to
Level 1 of the duration format that broke the WBS requestJOV00422
5.5.3.12013_20190123
7021Fixed attachments that were scrambled.
7026Cumulative time banks in cash are now displayed in cash.
7026Corrected the display of the approval button.
7026Fixed a memory leak
7026Improving packaging .
7026Label corrections
7026Corrections to the blank page when navigating to project approval.
7026Restructuring files to prevent it from being processed in memory.
7033Fix for importing expenses that gave erroneous data.
7049Fix of the change of context between time and expense when changing pagination (approval by resources)
7054Total Correction in Project Approval
7056Fixes on sql locks.
7073Patches in delegation where there were blank managers.
7074Required references, in some cases, when they were not part of a cost item category, were not validated.
7084Fix of the visualization of the sheets.
7091Changing how to save changes in timesheet to avoid too much transaction
7133Rewrite of recurrences.
7162Fixing the comments view. When adding an interval, the comments were read-only.
7168Correction of the variance arrow between the end EPC and the revised EPC.
5.5.3.14216_20190214
723024h validation for In / Out.
7234Translation of labels for the project status report.
7233Add Remove button in Expenses
7257Correction of the productivity calculation.
7261Duplicate Fixes When Retry
7286Added correction for changes between backups.
7298Release of the first mobile version, time section (alpha)
7310Fix of view for approval by project.
5.5.3.15717_20190301
Fix of different memory leaks.
Fix the asynchronous task that did not handle too many tasks
Fix some elements that created a reference exception
Adding logs when there is an error in the backup
Fix of the position of the interval menu
3886Fix in terms of out-of-period expenses and calculation of totals that were wrongJOV-01925-X0Q2
3899Locking the line when it is in completed statusJOV-01585-K3D1
3898Deletion that does not work after importJOV-01872-Z9P5
3930Wrong productivity calculation when editing a time lineJOV-01853-D2R7
5.5.3.16013_20190304
3972Fix some issue duplicating lines in expense sheet.
5.5.3.16014_20190304
3973During the auto-save, if the column is generated, it retries to save indefinitely
5.5.3.16914_20190313
3983Fix of customer list that does not appear in the old mode of WBS
3986For PC<1.5.4, the sql join to the projectGuid was also effective in the expenses.JOV-02394-G8M3
5.5.3.18810_20190401
3935Double Recurrences When Editing Two Rev.2 LinesJOV-02200-X9L8
3882Drag and drop is no longer active in advanced search (rev.2)JOV-01722-W6P9
5.5.3.18910_20190402
4039The comment box is too low when it is the last in the detail tab of the Project ApproibationJOV-02542-Q8Z5
5.5.3.19105_20190404
4069Expenses, when in detailed approval mode, the dates are shifted during the month of change of date.JOV-02613-D1C4
5.5.3.19205_20190405
4115
5.5.3.19516_20190408
4153Problem with editing after transfer when the day is out of period.
5.5.3.21113_20190424
4042Problem printing TEDI 5 during a period of more than 7 daysJOV-02564-B8J8
5.5.3.21205_20190425
2630Recurrence impossible to remove when the budget is closed
3422Recurrence allowed when project is closed